1- Operations Track Record of SOG in WQ Concession



click to enlarge image Click To Enlarge

Summary of Achievements in WQ Concession

Summary of Achievements in WQ Concession.
• 3D seismic data acquisition, processing, and interpretation.
• Drilling of 16 new wells from 2010 to 2017.
• Starting up four pilot water injection projects.
• Performing a complete integrated reservoir simulation study.
• 3D seismic data reprocessing for deep targets exploration.
• Succeed to renew the concession license for 10 years starting 2018 at competitive fiscal terms and minimum operations commitments.

2 - Operations Track Record of SOG in NB Concession



Story-NBClick To Enlarge

Summary of Achievements in NB Concession

• 3D Seismic data reprocessing.
• Drilling a number of 45 Wells (40 Producers, 3 Injectors, 2 Dry Hole).
• 3D Simulation Studies for Abrar, Ganna, Sidra and Ferdaus are completed.
• Startup of Ferdaus (UB), Abrar (A/R G), Ganna (A/R G), and Sidra (UB) Water Injection Projects

In addition

• Produced & co-produced more than ~51 million BO from its inception to date (End of Jan. 18).
• More than quadrupled the recoverable reserves in the operated concessions.
• Increase the production level of the fields operated by SOG more than four times.
• Deployed HiWay Frac technology for the first time in the Middle East.
• Delivered record minimum well cost in Egyptian Western Desert for similar depth levels.